. a) Based on your project schedule for Part II of the Course Project (Huntsville Plant Project), wh

. a) Based on your project schedule for Part II of the Course Project (Huntsville Plant Project), when is the project scheduled to complete? Please provide a date in the following format (Month, Day, Year). [5 points] b) What is the project duration in weeks? [5 points] (Points: 10) 2. a) After you enter all of your resources, what is your total budget for this project? [5 points] b) Was the project within the budget as set forth by the board of directors? What was the original budget? [5 points] (Points: 10) 3. Based on Course Project Part II, list the names of the critical path activities. (Points: 20) 4. After you enter all of your resources: a) What is your budget for the Planning Phase? What is the Planning Phase duration in weeks? [5 points] b) What is your budget for the Preparation Phase? What is the Preparation Phase duration in weeks? [5 points] c) What is your budget for the Plant Readiness Phase? What is the Plant Readiness duration in weeks? [5 points] d) What is your budget for the Production Phase? What is the Production Phase duration in weeks? [5 points] (Points: 20) 5. a) Are there any resource conflicts (over allocated )? If so, what resource(s)? [10 points] b) Provide the over allocated month for each resource. [10 points] (Points: 20) 6. What is the total cost (fixed and resource) for each of the following activities: a) Building Concept [4 points] b) Site Procurement [4 points] c) Building Construction [4 points] d) Truck Fleet Procurement [4 points] e) Production Startup [4 points] (Points: 20)The following steps should be utilized when updating the Huntsville Plant Project Plan with Microsoft Project:Open your .MPP file from the conclusion of Project Part ISet the “Status date” to April 17, 2009, under the /Project/Project InformationClick on OKIn instances where you had errors in Project Part I, correct accordingly.Update predecessors & durations for ALL activities as shown in the Task List (Table #3). Print or review the report “Un-started Tasks” and verify the information to the attached list.View – Reports – Current Activities – Un-started Tasks – Print.Use the information supplied on the Resource Cost List, enter variable costs; Hourly Resources and costs (NOT FIXED COSTS) by entering them on the Resource SheetClick on “View,” “Resource Sheet,” and enter the resource name, initials, and Std. Rate per hour. Assume only one of each resource is available.Use the information supplied on the Resource Cost List, enter fixed costs for appropriate activities.Choose View – More Views. In the views box, select Task Sheet, Apply. Next select a task (e.g., “Building Design”). Display the Cost Table (View – Table: Cost). Type “32,000” in the fixed cost column. Repeat for other fixed costs.Assign Hourly Resources and costs to the tasks that you have already entered, based on the information supplied on the attached Resource Loading List. Choose “View” – “Gantt Chart.” Place active window on the first task (Select Architect).Click on the Double Headed Icon on the upper Tool Bar (Assign Resources). In the resource assignment window, click on “PM.” Enter “10” in the units column. Click on “FS”; enter “60” Click on “Assign.”Repeat for all resources and activities according to the Resource Loading List.Then print the Resource Sheet showing: Resource Name, Initials and Costs. (View – Resource Sheet “File,” “Print”)Print a project summary report (“View,” “Reports,” “Overview,” “Project Summary”)neeeded infoTable #4 Resource/Cost Initials Full Name Cost Type Hourly Rate ($/Hr) or Fixed Cost ($)FS Facility Specialist Resource $21PM Project Manager Resource $32CP Corp. Personnel Resource $18PS Production Specialist Resource $24BD Building Design Fixed $32,000RC Real Estate Consultant Resource $55SC Site Cost Fixed $216,000ME Manufacturing Engineer Resource $18GC General Contractor Resource $70PC Permit Costs Fixed $3,200BC Building Costs Fixed $1,200,000PD Personnel Director Resource $20EC Equipment Costs Fixed $780,000AC Architect Resource $65IC Equipment Installation Fixed $120,000MS Marketing Specialist Resource $24AD Accounting Director Resource $22TC Truck Cost Fixed $135,000TM Traffic Manager Resource $19LC Landscaping Fixed $26,000PA Purchasing Agent Resource $22Table #5Task Task Name Resource Assignments: Resource Initials [percent assigned]1 “HUNTSVILLE – Project” 2 PLANNING PHASE 3 Select Architect FS [60%]; PM [10%]4 Recruit & Train Managers PM [15%]; CP [80%]5 Select Real Estate Consultant PM [10%]; FS [50%]6 Pre-Production Plan PS [80%]; ME [85%]; PM [20%]7 Create Production Plan PS [60%]; ME [80%]; MS [20%]8 Building Concept FS [40%]; AC [70%]9 Building Design FS [20%]; AC [10%]10 Site Procurement RC [70%]; MS [20%]; FS [30%]11 Select General Contractor PM [10%]; FS [30%]; PS [10%], AC [15%]12 Permits & Approvals PM [10%]; RC [30%]; GC [10%]; AC [15%]13 PREPARATION PHASE 14 Site Preparation PM [20%]; RC [20%]; GC [20%]15 Building Construction PM [10%]; FS [20%]; GC [35%]16 Landscaping FS [15%]17 PLANT READINESS PHASE 18 Plant Personnel Recruiting FS [10%]; PS [10%]; PM [10%]; MS [10%]; PD [10%]19 Equipment Procurement ME [40%]; PA [25%]20 Raw Material Procurement PS [10%]; ME [10%]; AD [10%]; PA [20%]21 Equipment Installation PS [10%]; ME [30%]; FS [40%]22 Product Distribution Plan MS [45%]; TM [40%]23 Truck Fleet Procurement PA [20%]; TM [10%]; AD [10%]24 Pre-Production Run PS [15%]; ME [70%]25 PRODUCTION PHASE 26 Production Start-Up PS [30%]; ME [70%]27 Distribution MS [20%]; TM [60%]Table #3 HUNTSVILLE PLANT TASK LIST Task Number Task Name Duration (Weeks) Predecessor(s)1 Huntsville Plant – Project (Project Level Task) 2 PLANNING PHASE (Summary) 3 Select Architect 2 none4 Recruit & Train Managers 6 none5 Select Real Estate Consultant 2 none6 Pre-Production Plan 2 none7 Create Production Plan 4 68 Building Concept 2 6, 39 Building Design 6 810 Site Procurement 3 5, 811 Select General Contractor 2 812 Permits & Approvals 3 5, 10, 1113 PREPARATION PHASE (Summary) 14 Site Preparation 4 9, 10, 1215 Building Construction 24 9, 12, 1416 Landscaping 3 1517 PLANT READINESS PHASE (Summary) 18 Plant Personnel Recruiting 8 4, 719 Equipment Procurement 24 720 Raw Material Procurement 8 721 Equipment Installation 4 15, 18, 1922 Product Distribution Plan 2 723 Truck Fleet Procurement 8 15, 2224 Pre-Production Plan 4 18, 20, 2125 PRODUCTION PHASE (Summary) 26 Production Start-Up 1 2427 Distribution 1 23, 26

"Is this question part of your assignment? We can help"

ORDER NOW

1. A power (Pv)dBm = -16 dBm is measured across a resistive load for the signal with frequency f0…

1. A power (Pv)dBm = −16 dBm is measured across a resistive load  for the signal  with frequency f0 = 500 Hz. Express the signal amplitude V0 in V and dBm, where
2. Let the source PSD of a two-terminal device, closed on a load, be
With  Knowing that the source impedance is ZS = 100 + j50 and that the system is matched, what is the average power Pv and the power density pv(f ) at the load?
 

"Is this question part of your assignment? We can help"

ORDER NOW

Use the extended bottleneck model to solve Problem 16.2 with the following number of parts in the…

Use the extended bottleneck model to solve Problem 16.2 with the following number of parts in the system: (a) N = 3 parts and (b) N = 6 parts. Also determine the manufacturing lead time for the two cases of N in (a) and (h).
Problem 16.2
Solve Problem 16.1 except the number of servers at station 2 (CNC milling machines) = 3 and the number of servers at station 3 (CNC drill presses) = 2. Note that with the increase in the number of machines from two to five, the FMC is now an FMS according to our definitions in Section 16.1.2.
Problem 16.1
A flexible manufacturing cell consists of two machining workstations plus a load/unload station. The load/unload station is station I. Station 2 performs milling operations and consists of one server (one CNC milling machine). Station 3 has one server that performs drilling (one CNC drill press). The three stations are connected by a part handling system that has one work carrier. The mean transport time is 2.5 min. The FMC produces three parts. A, B, and C. The part mix fractions and process routings for the three parts arc presented in the table below. The operation frequency fijk = 1.0 for all operations. Determine: (a) maximum production rate of the FMC, (b) corresponding production rates of each product, (c) utilization of each machine in the system, and (d) number of busy servers at each station.

"Is this question part of your assignment? We can help"

ORDER NOW

Using the data below, Use the 2 period moving average to create the forecast calculate the absolute

Using the data below, Use the 2 period moving average to create the forecast calculate the absolute error for the 3rd week.
Using the data below, calculate the squared error for the 4th week. Use the 2 period moving average to create the forecast.
Using the data below, Use the 2 period moving average to create the forecast calculate the absolute error for the 3rd week. Week Actuals 17.00 20.00 10.00 11.00 Submit Answer format: Number: Round to: 1 decimal places. Using the data below, calculate the squared error for the 4th week. Use the 2 period moving average to create the forecast. Week Time Series Value 16.00 5.00 25.00 9.00 Submit Answer format: Number: Round to: 1 decimal places.

"Is this question part of your assignment? We can help"

ORDER NOW

Explain what is yoga – Nursing Essay Tutors

Complementary and Alternative Health Care
Question(s):  
Explain what is yoga. Discuss the benefits of practicing Yoga (at least 3). 
Have you ever practice yoga?
Discuss your experience? 
Guidelines: APA format, The answer should be based on the knowledge obtained from reading the book, no just your opinion.
Complementary and Alternative Therapies for Nursing Practice (4th Edition)
ISBN-13: 9780133346503
ISBN-10: 0133346501
Author: Karen Lee Fontaine RN MSN
Edition: 4

"Is this question part of your assignment? We can help"

ORDER NOW

Assessment of Respiratory Status, health and medical assignment help

Assessment of Respiratory Status (graded)
Please review the video on the assignments page under the discussion section as it will provide you with an opportunity to immerse yourself in the role of a nurse addressing tobacco use during routine patient care. In doing so, reflect on what you have learned about tobacco use and the role that nurses and other interdisciplinary team members play in helping to assist tobacco users with quitting. While viewing, it is also important to keep in mind that tobacco users move through stages of change in the process of quitting. They move from pre-contemplation to contemplation, contemplation to preparation; preparation to abstinence; abstinence to maintenance. Every stage requires a different strategy by a nurse.
After watching the video, and reflecting on the information presented, address each of the following questions.

What are the common symptoms associated with an exacerbation of COPD?
What assessment techniques will you use to assess Mary?
Identify smoking strategies that would be appropriate for each of the encounters that Mary had with the nurse throughout the video that could have been used to assist Mary in quitting smoking.
Find a resource in your community that could assist Mary. Start by searching the Internet for your local health department’s website. What services are available to Mary? Briefly describe the services that the state quit line provides. Does it meet the 4 As? Is it accessible, acceptable, affordable, or available for Mary?
What will you do to follow-up on Mary’s smoking cessation process

"Is this question part of your assignment? We can help"

ORDER NOW

Leadership Styles Graphic Organizer – Nursing Essay Tutors

Choose five leadership models and styles. One model must be transformational leadership. Design a graphic organizer to compare servant leadership with the other models. Consider how these models or styles bring about organizational, team, or individual change or growth. How do leaders implement each of the models?

"Is this question part of your assignment? We can help"

ORDER NOW

Wk 1 Resp#1a and 1b PPharm, health and medicine homework help

Please respond to the questions/responses below. 2 paragraphs , 4-5 Sentences each paragraph, 3 references no more than 5 years old.
link to book below
http://stahlonline.cambridge.org/essential_4th.jsf

My instructors response to me was:
Response 1a)
Further develop the agonist to antagonist spectrum and touch upon partial agonists and inverse agonists.
Thank you
Dr. Earl

Response 1b)
Calcium is a tricky ion. It works in both ion gated and G-coupled protein receptors. Be careful with this point. Inverse agonists basically turn a receptor “off”. It also negates any base line activity.
Hope this clarifies a bit for you.
Dr. Earl

The post Wk 1 Resp#1a and 1b PPharm, health and medicine homework help first appeared on Nursing School Essays.

"Is this question part of your assignment? We can help"

ORDER NOW

Research Assignment

evidence table for their EBP project in research class.  
The post Research Assignment appeared first on Nursing Essay Tutors.
Research Assignment was first posted on April 29, 2024 at 3:38 pm.©2019 "nursingassignmenttutor". Use of this feed is for personal non-commercial use only. If you are not reading this article in your feed reader, then the site is guilty of copyright infringement. Please contact me at [email protected]

"Is this question part of your assignment? We can help"

ORDER NOW

governance section, health and medicine homework help

I need you to go over the three proposals ( just governance part) that attached and write 1 page based on :
what organisations of the US government will run the system (The DoD and the Va in this cases, that will not change) and what persons in the VA/DoD may be responsible for this, you could suggest existing positions already at the DoD or VA (just a brief check on their websites or Wikipedia about each office’s governance) and perhaps propose a joint committee that will monitor the joint DoD/VA system. 2) what is the responsibility, for this group (day-to-day oversight, system maintenance etc) For other guidance, you could look at the project governance sections for proposals 3 and 5 to see how to other groups approached it. My advice would be to use these are a guide and outline for your section here. It doesn’t need to be a long section (my guess about 100 words of that)
Do NOT COPY and PASTE. Please cite your references using AMA.

"Is this question part of your assignment? We can help"

ORDER NOW